IMPORTANT INSTRUCTIONS
STEP
1 - Cleaning
a. Thoroughly clean roof
sheeting and bead of gutter where
bonding will take place.
b. Wipe surfaces with 'Clear Priming Fluid' (MEK)
- obtainable from plumbing suppliers.
STEP 2 - Preparation
Tite-R-Bond™ must be used!
One light wipe over surface being bonded to.
STEP 3 - Temperature
Leaf Free should be fitted
at or above 20°C. If temperature is lower, use
a heat gun to warm the roof/gutter contact surface.
STEP 4 -
Fitting
Follow instructions below for
best outcome. With correct fitting, the high bond adhesive
vulcanizes to the surface, creating a long term, reliable
fixing system. Bond strength is dependent on substrate condition
and correct preparation of the surface.
|